Granby dam Cement bottleneck that threatened to slow repairs, broken. Post Ag 15, 1951 p.l c.6 Repairs progress on 3-shift operation. Post Ag 22, 1951 p.3 c.8 Success in stopping leakage reported. Post s ?, 1951 p.43 c.l No danger seen in leaking of 3rd dike at Granby. Post S 11, 1951 p.2 c.4 Repairs slowed by labor shortage. Post S 19, 1951 p.20 c.l Repairs cut down seepage under dikes. Post N ?, 1951 P 52 c.2